Skip to content

Task

The universal work item — a to-do, in Jira-ticket style. Task doesn’t sit “between” the other entities in a chain; it’s cross-cutting, attaching to whichever one it’s actually about: an Assessment on a Request, a follow-up call logged on a Client, a punch-list item on a Job. Find every task across every entity in one place on the Tasks Board. See How ServiceDock Works for the bigger picture.

Field What it means
Title Short summary of the task.
Description The detail of what needs doing.
Status See below.
Priority low, medium, high, or urgent.
Notes Free-text notes.
Type Which entry from your workspace’s Task Type catalog this is — see the Task Types reference for the default catalog (Assessment, Installation, Follow Up, etc).
Primary entity See below — which single entity this task is mainly about.
All day / Start / End Scheduling — a task can be unscheduled, timed, or all-day.
Assignees Who’s actually doing the work — a task can have more than one assignee, each with a role (primary, support, or observer).

Standard housekeeping fields (created/updated/deleted timestamps, reporter) exist here as on every entity and aren’t repeated above.

Status Meaning
pending Not started yet — the default for a new task.
in_progress Actively being worked.
completed Done.
cancelled Called off.
on_hold Paused, but not cancelled.

Every task is mainly “about” exactly one of these — this is what drives whether a task shows up as a direct item on that entity’s own page, versus just being indirectly linked. A task can also carry secondary links to other entities at the same time (e.g. a task primarily on a Job can also reference the Client), but never two of the same entity type at once.

Value Meaning
client Mainly about a client — e.g. a follow-up call.
request Mainly about a request — e.g. an Assessment visit.
job Mainly about a job — e.g. a punch-list item.
quote Mainly about a quote.
property Mainly about a property.